Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Apr 2025 |
| Application filed | 6 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers LTD |
| Land area | 1,200 m² |
| Forest land | 230 m² |
| Project cost | ₹10 lakh |
| Village / locality | Natadol (Gjar) |
| Taluk / tehsil | Jainti |
| District | Almora |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01285 |
In context
28 applications in Almora since January 2022 are in the same category (Telecom): 0 approved, 18 filed or under review, and 10 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 62% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Natadol (Gjar), Jainti, Almora, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhagadevli Village Group Pumping Drinking Water Scheme (P-2) length 6.087 km — forest land use approved, 1.2 km away
- Ofc Bharat Net Project — initial checks, 3.8 km away
- Ofc Bharat Net Project — initial checks, 3.9 km away
- School for Underprivileged Children by Shri Kalyanika Himalaya Devasthanam Trust — more information requested, 5.2 km away
- श्री कल्याणिका विद्यापीठ के निर्माण हेतु 0.200 है0 भूमि का लीज आवंटन। by Shri… — lapsed, 5.3 km away
- अल्मोड़ा शहरफाटक मोटर मार्ग से डोल आश्रम पूर्व निर्मित मोटर मार्ग में प्रभावित… — more information requested, 5.4 km away
- माननीय मुख्यमंत्री जी घोषणा सं0 382/2023 के अंतर्गत जनपद अल्मोड़ा के विकासखण्ड… — not approved, 7.6 km away
- जनपद अल्मोड़ा के विधानसभा क्षेत्र जागेश्वर के अन्तर्गत जिफल्टा से कोकिलागॉव… — more information requested, 8.4 km away
More from Indus Towers LTD in Almora
- Mobile Tower Installation at Jageshwar Range — lapsed
- Mobile Tower Installation at Village Bari — lapsed
- Mobile Tower Installation at Village Ranikhet Range — initial checks
- Mobile Tower Installation at Chimtoli Village — lapsed
- Mobile Tower Installation at Village Matena — lapsed
- Mobile Tower Installation at Village Bari — lapsed
9 Indus Towers projects in Almora
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.