Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Apr 2025 |
| Application filed | 6 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers LTD |
| Land area | 2.3 acres (0.9 ha) |
| Forest land | 230 m² |
| Project cost | ₹10 lakh |
| Village / locality | Gadholi |
| Taluk / tehsil | Almora |
| District | Almora |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-02006 |
In context
28 applications in Almora since January 2022 are in the same category (Telecom): 0 approved, 18 filed or under review, and 10 withdrawn, lapsed or rejected. At 2.3 acres, this one is larger than 94% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gadholi, Almora, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- जल जीवन मिशन कार्यक्रम के अंतर्गत मटेना ग्राम समूह पेयजल योजना का निर्माण। by… — more information requested, 200 m away
- जल जीवन मिशन कार्यक्रम के अन्तर्गत घनेली पेयजल योजना का निर्माण by Uttarakhand… — under forest review, 2.5 km away
- जल जीवन मिशन कार्यक्रम के अंतर्गत कुटगोली पेयजल योजना का निर्माण। by… — under forest review, 2.5 km away
- Almora (Jail) to Kangarchhina (Length 32.0) — lapsed, 2.7 km away
- Kasardevi Village Group (pumping) Drinking Water Scheme (P-2) under Jal Jeevan… — more information requested, 2.8 km away
- जनपद अल्मोड़ा के विधानसभा क्षेत्र सोमेश्वर के अन्तर्गत… — in-principle approval, conditions pending, 4 km away
- जनपद अल्मोड़ा के विकासखण्ड हवालबाग में ग्राम पपरसैली में पानी की टंकी से चितई… — more information requested, 4.2 km away
- Simtola Village Group (pumping) Drinking Water Scheme (P-2) under Jal Jeevan… — more information requested, 4.3 km away
More from Indus Towers LTD in Almora
- Mobile Tower Installation at Jageshwar Range — lapsed
- Mobile Tower Installation at Village Bari — lapsed
- Mobile Tower Installation at Village Ranikhet Range — initial checks
- Mobile Tower Installation at Village Natadol — lapsed
- Mobile Tower Installation at Chimtoli Village — lapsed
- Mobile Tower Installation at Village Bari — lapsed
9 Indus Towers projects in Almora
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.