Quick answers
What is this project?
Haridwar - Dehradun Natural Gas Pipeline (8 inch dia) by GAIL is a proposed pipeline project in Khairi Khurd, Rishikesh, Dehradun, Uttarakhand. The site covers 1.1 acres.
Who is building it?
The applicant is GAIL (India) Limited (GAIL).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Khairi Khurd, Rishikesh, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹9.1 crore; a site of 1.1 acres and 1.1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 13 Mar 2026.
Project details
| Official title | Haridwar - Dehradun Natural Gas Pipeline (8 inch dia) along with OFC (Repair Works) |
|---|---|
| Status | More information requested |
| Status since | 23 Nov 2026 |
| Application filed | 13 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | GAIL (India) Limited (GAIL) |
| Land area | 1.1 acres (0.4 ha) |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹9.1 crore |
| Village / locality | Khairi Khurd |
| Taluk / tehsil | Rishikesh |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01308 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Mar 2026 (this page) | More information requested | 1.1 acres | ₹9.1 crore |
| New project filed 12 Jan 2026 | Under wildlife review | 1.1 acres | ₹9.1 crore |
In context
7 applications in Dehradun since January 2022 are in the same category (Pipelines): 0 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khairi Khurd, Rishikesh, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Haridwar - Dehradun Natural Gas Pipeline (8 inch dia) by GAIL — under wildlife review, 0 m away
- Rkgc — lapsed, 250 m away
- Request for Permission for Establishment of Underground Telegraph… — under wildlife review, 250 m away
- Repair (using interlocking tiles) of Forest Road from Satyanarayan to Goharimafi — decision issued, 1 km away
- Garhimay chak Drinking Water Supply Scheme — forest land use approved, 2.7 km away
- Sand, Bajri & Boulder Mine — under wildlife review, 3.3 km away
- Sahnagar Sand, Bajri & Boulder Mine — more information requested, 3.3 km away
- Bhattowala Drinking Water Supply Scheme — forest land use approved, 3.8 km away
All 86 GAIL (India) (GAIL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.