Request for Permission for Establishment of Underground Telegraph Infrastructure/ Laying of Optical Fiber Cable(OFC) from Near Nepali Farm Bridge Chamber to Airtel Tower RWLA09 on Dehradun-Haridwar Road. (2000mt) in Public Interest.

Request for Permission for Establishment of Underground Telegraph Infrastructure/ Laying of Optical Fiber Cable(OFC) from Near Nepali Farm Bridge Chamber to Airtel Tower RWLA09 on Dehradun-Haridwar Road. (2000mt) in Public Interest is a proposed road project in Khairi Khurd, Rishikesh, Dehradun, Uttarakhand. Its stated project cost is ₹7 lakh. As of 27 Nov 2026, its status is “Under wildlife review” (since 20 Jul 2026).

See it on the live map All projects in Dehradun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Request for Permission for Establishment of Underground Telegraph Infrastructure/ Laying of Optical Fiber Cable(OFC) from Near Nepali Farm Bridge Chamber to Airtel Tower RWLA09 on Dehradun-Haridwar Road. (2000mt) in Public Interest is a proposed road project in Khairi Khurd, Rishikesh, Dehradun, Uttarakhand.

Who is building it?

The applicant is Vijay kumar.

Has it been approved?

Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.

Where is it?

In Khairi Khurd, Rishikesh, Dehradun, Uttarakhand.

How big is it?

It has a stated cost of ₹7 lakh.

When was it filed?

The application was filed on 20 Jul 2026.

Project details

StatusUnder wildlife review
Status since20 Jul 2026
Application filed20 Jul 2026
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantVijay kumar
Project cost₹7 lakh
Village / localityKhairi Khurd
Taluk / tehsilRishikesh
DistrictDehradun
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-02279

In context

42 applications in Dehradun since January 2022 are in the same category (Roads & highways): 6 approved, 20 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Khairi Khurd, Rishikesh, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.