Quick answers
What is Chilond Water Supply Scheme?
Chilond Water Supply Scheme is a lapsed water and irrigation project in Malla Kaliphat R F, Ukhimath, Rudraprayag, Uttarakhand. The site covers 0.2 acres.
Who is building it?
The applicant is Uttarakhand Peyjal Nigam.
Has it been approved?
No. The application was lapsed on 6 May 2026, so it is no longer under consideration.
Where is it?
In Malla Kaliphat R F, Ukhimath, Rudraprayag, Uttarakhand.
How big is it?
It has a stated cost of ₹71 lakh; a site of 0.2 acres and 660 m² of forest land.
When was it filed?
The application was filed on 30 May 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Chilond Water Supply Scheme
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 May 2026 |
| Application filed | 30 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Uttarakhand Peyjal Nigam |
| Land area | 700 m² |
| Forest land | 660 m² |
| Project cost | ₹71 lakh |
| Village / locality | Malla Kaliphat R F |
| Taluk / tehsil | Ukhimath |
| District | Rudraprayag |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01456 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Aug 2025 | Decision issued | 0.2 acres | ₹71 lakh |
| New project filed 30 May 2024 (this page) | Lapsed | 0.2 acres | ₹71 lakh |
In context
44 applications in Rudraprayag since January 2022 are in the same category (Water & irrigation): 1 approved, 12 filed or under review, and 30 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 86% of them.
Where it is
Malla Kaliphat R F, Ukhimath, Rudraprayag, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chilond Water Supply Scheme — decision issued, 0 m away
- Gaurikund Bypass Bridle Road (0.80km) With 60m Span and 30m Span Bridge Under… — decision issued, 5 km away
- Gaurikund Bypass Bridle Road (0.80km) With 60m Span and 30m Span Bridge Under… — not approved, 5 km away
- Gaurikund Water Supply Scheme — more information requested, 5.6 km away
- Gaurikund Water Supply Scheme — more information requested, 5.6 km away
- Phata Byung Hydro Electric Project (76 MW) — cleared for impact study, 6.2 km away
- Uniyana Water Supply Scheme — under wildlife review, 6.6 km away
- Uniyana Water Supply Scheme — lapsed, 6.6 km away
More from Uttarakhand Peyjal Nigam in Rudraprayag
- Uniyana Water Supply Scheme — under wildlife review
- Barngali Water Supply Scheme — more information requested
- Ransi Water Supply Scheme — under wildlife review
- Uniyana Water Supply Scheme — lapsed
- Jaggi Baidula Water Supply Scheme — more information requested
- Gaurikund Water Supply Scheme — more information requested
43 Uttarakhand Peyjal Nigam projects in Rudraprayag
All 50 Uttarakhand Peyjal Nigam projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.