Quick answers
What is Under Jal jeevan Mission scheme Payjal line in Mahar Gaon?
Under Jal jeevan Mission scheme Payjal line in Mahar Gaon is a proposed pipeline project in Margaon, Devprayag, Tehri Garhwal, Uttarakhand. The site covers 0.2 acres.
Who is building it?
The applicant is Uttaranchal Jal Sansthan.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Margaon, Devprayag, Tehri Garhwal, Uttarakhand.
How big is it?
It has a stated cost of ₹16 lakh; a site of 0.2 acres and 670 m² of forest land.
When was it filed?
The application was filed on 20 Jun 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 11 Aug 2026 |
| Application filed | 20 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Uttaranchal Jal Sansthan |
| Land area | 700 m² |
| Forest land | 670 m² |
| Project cost | ₹16 lakh |
| Village / locality | Margaon |
| Taluk / tehsil | Devprayag |
| District | Tehri Garhwal |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01480 |
In context
8 applications in Tehri Garhwal since January 2022 are in the same category (Pipelines): 0 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Margaon, Devprayag, Tehri Garhwal, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand, Bajri and Boulder mine in Alaknanda River khasra no. 670 & 672m… — environmental approval granted, 4.7 km away
- OFC Bharat Net Project — initial checks, 5.2 km away
- OFC Bharat Net Project — initial checks, 5.2 km away
- OFC Bharat Net Project — initial checks, 5.2 km away
- Chunnikhal Noda Tegad Motor Road — under forest review, 7.5 km away
- 132 kV D/C Overhead Line at Srinagar for proposed Traction Substation (TSS) of… — in-principle approval, conditions pending, 9.2 km away
- Ringoli Malli to Dang Halpada Kalyani Kimkhar Okhali Motor road. — more information requested, 9.8 km away
- Solid Waste Management and Disposal Facility including sanitary landfill at… — cleared for impact study, 10.3 km away