Quick answers
What is this project?
132 kV D/C Overhead Line at Srinagar for proposed Traction Substation (TSS) of Rail Vikas Nigam Ltd is a proposed power project in Dyuli, Devprayag, Tehri Garhwal, Uttarakhand. The site covers 16.9 acres.
Who is building it?
The applicant is M D Power Transmission Corporation of Uttranchal Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Dyuli, Devprayag, Tehri Garhwal, Uttarakhand.
How big is it?
It has a stated cost of ₹3 crore; a site of 16.9 acres and 3.1 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 19 Jul 2023.
Project details
| Official title | Construction of 132 kV D/C Overhead Line at Srinagar for proposed Traction Substation (TSS) of Rail Vikas Nigam Ltd. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 25 Nov 2026 |
| Application filed | 19 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | M D Power Transmission Corporation of Uttranchal Limited |
| Land area | 16.9 acres (6.8 ha) |
| Forest land | 3.1 acres (1.2 ha) |
| Project cost | ₹3 crore |
| Village / locality | Dyuli |
| Taluk / tehsil | Devprayag |
| District | Tehri Garhwal |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01945 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dyuli, Devprayag, Tehri Garhwal, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Solid Waste Management and Disposal Facility including sanitary landfill at… — cleared for impact study, 1.2 km away
- 126 KM Rishikesh-Karnaprayag New BG Rail Line - Additional 1.602 Hec Muck… — more information requested, 4.1 km away
- Proposed Sand, Bajri and Boulder mine in Alaknanda River khasra no. 670 & 672m… — environmental approval granted, 4.7 km away
- Sand, Bajri & Boulder (RBM) Mining in River Alaknanda, Khasra No 1778 Area… — under environmental review, 7.7 km away
- Under Jal jeevan Mission scheme Payjal line in Mahar Gaon — more information requested, 9.2 km away
- OFC Bharat Net Project — initial checks, 9.3 km away
- OFC Bharat Net Project — initial checks, 9.3 km away
- OFC Bharat Net Project — initial checks, 9.3 km away
All 6 M D Power Transmission Corporation of Uttranchal projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.