Project details
| Status | Under wildlife review |
|---|---|
| Status since | 9 Sept 2025 |
| Application filed | 9 Sept 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ujvn LTD |
| Land area | 21 acres (8.5 ha) |
| Project cost | ₹136.2 crore |
| Village / locality | Fakkot |
| Taluk / tehsil | Munsiari |
| District | Pithoragarh |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-02242 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Sept 2025 (this page) | Under wildlife review | 21 acres | ₹136.2 crore |
| New project filed 11 Jun 2025 | More information requested | 21 acres | ₹136.2 crore |
Where it is
Fakkot, Munsiari, Pithoragarh, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jimbagad Small Hydro Project (3X4 MW) — more information requested, 0 m away
- Jimbagad Small Hydro Project (3X4 MW) — more information requested, 0 m away
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 0.300… — environmental approval granted, 6 km away
- New Construction of Tomik to Jantharia Foot Track — more information requested, 6.2 km away
- Construction of Josha to Gandhinagar Motor Road. — lapsed, 7 km away
- New construction of Foot Bridge at Bhujagaad River in 70m span at Munsyari — lapsed, 14.1 km away
- New Construction of Lodh Band to Nankana Motor road. — more information requested, 14.2 km away
- Row Permission for Laying Optical fiber Cable from Ramganga Bridge to Munsyari… — lapsed, 14.9 km away
More from Ujvn LTD in Pithoragarh
- Jimbagad Small Hydro Project (3X4 MW) — more information requested
3 Ujvn projects in Pithoragarh
All 9 Ujvn projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.