Quick answers
What is this project?
"Sand/morram Mining" Project at Gata No.- 195/1, Village- Bahadurpur Syodha, Tehsil- Naraini, District- Banda, U.P. (Applied Area : 14.3850 ha.) is an approved mining project in Bahadurpur Kalinzar, Naraini, Banda, Uttar Pradesh. The site covers 35.6 acres.
Who is building it?
The applicant is Omprakash Bharadwaj.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Sept 2022), as of 27 Nov 2026.
Where is it?
In Bahadurpur Kalinzar, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 35.6 acres.
When was it filed?
The application was filed on 28 Sept 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Sept 2022 |
| Application filed | 28 Sept 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Omprakash Bharadwaj |
| Land area | 35.6 acres (14.4 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Bahadurpur Kalinzar |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-00062 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 35.6 acres, this one is larger than 51% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Bahadurpur Kalinzar, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand/Morrum Mining having lease area-7.2980 ha (18.03 acre) along… — environmental approval granted, 1.7 km away
- Riverbed Sand/Morrum Mining having lease area-7.2980 ha (18.03 acre) along… — cleared for impact study, 1.7 km away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Jarar, Gata No.- 851,… — environmental approval granted, 1.7 km away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Jarar, Gata No.- 851,… — cleared for impact study, 1.7 km away
- "Gitti/ Patthar" Project at Gata No.- 2450 (Khand No.- 02), Village- Jarar,… — under environmental review, 4.7 km away
- "Gitti/ Patthar" Project at Gata No.- 2450 (Khand No.- 02), Village- Jarar,… — cleared for impact study, 4.7 km away
- Building Stone, Khandas & Gitti, Boulder Mining Project — environmental approval granted, 4.8 km away
- "Building Stone, Khandas & Gitti, Boulder Mining Project" located at Gata No.… — under environmental review, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.