Quick answers
What is this project?
"Sand/Morrum Mine" from Riverbed of Ken River, Village- Jarar, Gata No.- 851, 866, 867, 869, 872 & 876, lease area- 8.00 ha. (19.76 Acres), Tehsil- Naraini, District- Banda, Uttar Pradesh, Project Proponent- Shri Sulabh Saxena is a proposed mining project in Pitampur, Naraini, Banda, Uttar Pradesh. The site covers 19.8 acres.
Who is building it?
The applicant is Sulabh Saxena.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Jun 2025), as of 27 Nov 2026.
Where is it?
In Pitampur, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 19.8 acres.
When was it filed?
The application was filed on 5 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mine" from Riverbed of Ken River, Village- Jarar, Gata No.- 851, 866, 867,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Jun 2025 |
| Application filed | 5 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sulabh Saxena |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Pitampur |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03294 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Nov 2025 | Environmental approval granted | 19.8 acres | ₹2.2 crore |
| Early planning filed 5 May 2025 (this page) | Cleared for impact study | 19.8 acres | ₹2.2 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 19.8 acres, this one is smaller than 73% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Pitampur, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Jarar, Gata No.- 851,… — environmental approval granted, 0 m away
- "Sand/morram Mining" Project at Gata No.- 195/1, Village- Bahadurpur Syodha,… — environmental approval granted, 1.7 km away
- Riverbed Sand/Morrum Mining having lease area-7.2980 ha (18.03 acre) along… — environmental approval granted, 3.4 km away
- Riverbed Sand/Morrum Mining having lease area-7.2980 ha (18.03 acre) along… — cleared for impact study, 3.4 km away
- "Gitti/ Patthar" Project at Gata No.- 2450 (Khand No.- 02), Village- Jarar,… — under environmental review, 3.9 km away
- "Gitti/ Patthar" Project at Gata No.- 2450 (Khand No.- 02), Village- Jarar,… — cleared for impact study, 3.9 km away
- Building Stone, Khandas & Gitti, Boulder Mining Project — environmental approval granted, 4.2 km away
- "Building Stone, Khandas & Gitti, Boulder Mining Project" located at Gata No.… — under environmental review, 4.2 km away
More from Sulabh Saxena in Banda
- Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914,… — environmental approval granted
- Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.