Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Arjit Shukla |
| Land area | 8.3 acres (3.4 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Dhanai Khera |
| Taluk / tehsil | Sitapur |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00074 |
In context
55 applications in Sitapur since January 2022 are in the same category (Mining): 39 approved, 16 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.3 acres, this one is larger than 93% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 13.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Dhanai Khera, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Excavation Project" — environmental approval granted, 250 m away
- Proposed "Ordinary Soil Mining Project" at Gata No. 282, 268, 348, 267, 269,… — initial checks, 350 m away
- Proposed 200 Bedded District Hospital, Sitapur, Uttar Pradesh. — environmental approval granted, 3.2 km away
- Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road… — more information requested, 3.9 km away
- Proposed Protected Forest Land to be diverted for construction of 02 Lane… — forest land use approved, 5 km away
- "Ordinary Soil Mining" Project at Gata No.- 92, Village-Kasimpur, Tehsil-… — environmental approval granted, 5.2 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — lapsed, 6.1 km away
- Narhi Soil Mining Project — environmental approval granted, 7.5 km away