Project details
| Official title | Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road and Its Protective Work to Beside Kainchi Bridge on Sarayan River, in District:- Sitapur. |
|---|---|
| Status | More information requested |
| Status since | 2 Nov 2026 |
| Application filed | 18 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bridge Construction Unit III Lucknow |
| Land area | 3,700 m² |
| Forest land | 50 m² |
| Project cost | ₹16.4 crore |
| Village / locality | Sitapur |
| Taluk / tehsil | Sitapur |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05859 |
In context
10 applications in Sitapur since January 2022 are in the same category (Roads & highways): 2 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 200 Bedded District Hospital, Sitapur, Uttar Pradesh. — environmental approval granted, 1.2 km away
- Proposed Protected Forest Land to be diverted for construction of 02 Lane… — forest land use approved, 2.4 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — lapsed, 3.2 km away
- "Ordinary Soil Excavation Project" — environmental approval granted, 3.6 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 282, 268, 348, 267, 269,… — initial checks, 3.8 km away
- Ramraj Soil Mining Project — environmental approval granted, 3.9 km away
- Proposed Protected Land to be diverted for Entry/Exit approach to BPCL… — more information requested, 4.9 km away
- Proposed Protected Land to be diverted for Entry/Exit approach to BPCL… — lapsed, 4.9 km away
More from Bridge Construction Unit III Lucknow in Sitapur
- Proposed Forest Land to be diverted for construction of Bridge & Approach Road — lapsed
- Proposed Protected Forest Land to be diverted for Construction of 02 Lane… — lapsed
- Proposed Protected Forest Land to be diverted for construction of 02 Lane… — forest land use approved
- Proposed Protected Forest Land to be diverted for construction of 02 Lane… — forest land use approved
5 Bridge Construction Unit projects in Sitapur
All 13 Bridge Construction Unit projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.