What is Developing? Open the mapMap

Environmental approval grantedMining · Mirzapur, Uttar Pradesh

Building stone (Sandstone) mine (Gata No. 360, Lease area-1.01 Ha.) for the production capacity 10100 m3, Village- Adhwar, Tehsil- Chunar, District- Mirzapur Uttar Pradesh by Shri Arjun Singh

Building stone (Sandstone) mine (Gata No. 360, Lease area-1.01 Ha.) for the production capacity 10100 m3, Village- Adhwar, Tehsil- Chunar, District- Mirzapur Uttar Pradesh by Shri Arjun Singh is an approved mining project in Lalpur, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres. Its stated project cost is ₹71 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 15 Nov 2022).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Building stone (Sandstone) mine (Gata No. 360, Lease area-1.01 Ha.) for the production capacity 10100 m3, Village- Adhwar, Tehsil- Chunar, District- Mirzapur Uttar Pradesh by Shri Arjun Singh is an approved mining project in Lalpur, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.

Who is building it?

The applicant is Arjun Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 15 Nov 2022), as of 27 Nov 2026.

Where is it?

In Lalpur, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹71 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 15 Nov 2022.

Project details

StatusEnvironmental approval granted
Status since15 Nov 2022
Application filed15 Nov 2022
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantArjun Singh
Land area2.5 acres (1 ha)
Project cost₹71 lakh
Village / localityLalpur
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00110

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.

11 other mining leases have applied within 500 m of this site; together with this one they cover 45.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 87 mining leases have applied within 5 km.

Where it is

Lalpur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.