Quick answers
What is this project?
Proposed project of Building Stone Sand Stone Quartizite Ballast (Gitti) Mining project at Arazi No. – 749, Area- 4.39 ha, Village- Adhwar, Tehsil- Chunar, District- Mirzapur (U.P.) by M/s Vishwnath Mining is a proposed mining project in Lalpur, Chunar, Mirzapur, Uttar Pradesh. The site covers 10.8 acres.
Who is building it?
The applicant is Vishwnath mining.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Lalpur, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 10.8 acres.
When was it filed?
The application was filed on 12 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 24 Aug 2026 |
| Application filed | 12 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vishwnath mining |
| Land area | 10.8 acres (4.4 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Lalpur |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04138 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 10.8 acres, this one is larger than 93% of them.
16 other mining leases have applied within 500 m of this site; together with this one they cover 315.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 87 mining leases have applied within 5 km.
Where it is
Lalpur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building stone, Sand Stone, Quartizite, Ballast, Gitti" Mine from Village-… — cleared for impact study, 150 m away
- Proposed Bhagautidei Building Stone (Sandstone) Mining Project At Arazi No… — environmental approval granted, 200 m away
- Proposed project of Building Stone Sand Stone Quartizite Ballast (Gitti)… — under environmental review, 200 m away
- Building stone (Sandstone) mine (Gata No. 360, Lease area-1.01 Ha.) for the… — environmental approval granted, 200 m away
- "Sand Stone (Khanda, Gitty, Boulders) Mining Project" at Araji No. 703 Mining… — lapsed, 250 m away
- Existing Project of "Building Stone Sandstone Mining Project" at Gata No. 360… — returned to applicant, 250 m away
- Building stone as Sand stone Gitty/Boulder/Patiya Mining at Gata No. - 705,… — environmental approval granted, 300 m away
- Building stone as Sand stone Gitty/Boulder/Patiya Mining at Gata No. - 705,… — cleared for impact study, 300 m away
More from Vishwnath mining in Mirzapur
- Proposed Project of Buiding Stone Sandstone, Gitti,Boulder, Patiya Mine at… — environmental approval granted
- Proposed Project of Buiding Stone Sandstone, Gitti,Boulder, Patiya Mine at… — environmental approval granted
- Proposed Project of Buiding Stone Sandstone, Gitti,Boulder, Patiya Mine at… — cleared for impact study
- Proposed Project of Buiding Stone Sandstone, Gitti,Boulder, Patiya Mine at… — cleared for impact study
All 5 Vishwnath mining projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.