One of 3 filings for this project. The project's main page, with every filing and where each stands: C or B HEAVY MOLASSES / CANE JUICE SYRUP/ GRAIN BASED DISTILLERY HAVING CAPACITY 200 KLD
Project details
| Official title | ESTABLISHMENT OF C or B HEAVY MOLASSES / CANE JUICE SYRUP/ GRAIN BASED DISTILLERY HAVING CAPACITY 200 KLD ALONG WITH CO GEN POWER – 7 MW |
|---|---|
| Status | Cleared for impact study |
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Triveni Engineering and Industries LTD |
| Land area | 18.7 acres (7.6 ha) |
| Project cost | ₹200 crore |
| Village / locality | Rani Nagla |
| Taluk / tehsil | Thakurdwara |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00222 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Mar 2024 | Initial checks | 18.7 acres | ₹200 crore |
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 18.7 acres | ₹200 crore |
| New project filed 6 Jun 2023 | Environmental approval granted | 18.7 acres | ₹200 crore |
In context
20 applications in Moradabad since January 2022 are in the same category (Industry): 13 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 18.7 acres, this one is smaller than 56% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rani Nagla, Thakurdwara, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- C or B HEAVY MOLASSES / CANE JUICE SYRUP/ GRAIN BASED DISTILLERY HAVING… — initial checks, 0 m away
- C or B HEAVY MOLASSES / CANE JUICE SYRUP/ GRAIN BASED DISTILLERY HAVING… — environmental approval granted, 0 m away
- Expansion of existing Sugar unit from 5000 TCD to 10000 TCD and expansion in… — environmental approval granted, 250 m away
- Expansion of existing Sugar unit from 5000 TCD to 10000 TCD and expansion in… — cleared for impact study, 250 m away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 8.9 km away
- जनपद मुरादाबाद में लोक निर्माण अनुभाग-10 उत्तर प्रदेश शासन के शासनादेश… — in-principle approval, conditions pending, 9.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 9.2 km away
- Proposed Ordinary Soil Project at at Gata No.–16 & 72 — environmental approval granted, 9.9 km away
More from Triveni Engineering and Industries LTD in Moradabad
- Expansion of existing Sugar unit from 5000 TCD to 10000 TCD and expansion in… — environmental approval granted
- Expansion of existing Sugar unit from 5000 TCD to 10000 TCD and expansion in… — cleared for impact study
5 Triveni Engineering and projects in Moradabad
All 14 Triveni Engineering and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.