What is Developing? Open the mapMap

Environmental approval grantedIndustry · Moradabad, Uttar Pradesh

Expansion of existing Sugar unit from 5000 TCD to 10000 TCD and expansion in co-gen power capacity from 8.0 MW to 15.0 MW within existing industry premises by M/s Triveni Engineering & Industries Limited

Expansion of existing Sugar unit from 5000 TCD to 10000 TCD and expansion in co-gen power capacity from 8.0 MW to 15.0 MW within existing industry premises by M/s Triveni Engineering & Industries Limited is an approved industrial project in Rani Nagla, Thakurdwara, Moradabad, Uttar Pradesh. The site covers 47 acres. Its stated project cost is ₹480 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 Oct 2023).

See it on the live map All projects in Moradabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion of existing Sugar unit from 5000 TCD to 10000 TCD and expansion in co-gen power capacity from 8.0 MW to 15.0 MW within existing industry premises at Village: Rani Nangal, Tehsil: Thakurdwara, District: Moradabad, Uttar Pradesh by M/s Triveni Engineering & Industries Limited
StatusEnvironmental approval granted
Status since28 Oct 2023
Application filed28 Oct 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantTriveni Engineering and Industries LTD
Land area47 acres (19 ha)
Project cost₹480 crore
Village / localityRani Nagla
Taluk / tehsilThakurdwara
DistrictMoradabad
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00450

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 28 Oct 2023 (this page)Environmental approval granted47 acres₹480 crore
Early planning filed 11 May 2023Cleared for impact study47 acres₹480 crore

In context

20 applications in Moradabad since January 2022 are in the same category (Industry): 13 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 47 acres, this one is larger than 72% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rani Nagla, Thakurdwara, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Triveni Engineering and Industries LTD in Moradabad

5 Triveni Engineering and projects in Moradabad
All 14 Triveni Engineering and projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.