What is Developing? Open the mapMap

Environmental approval grantedMining · Mahoba, Uttar Pradesh

Building Stone, Khanda, Boulder, Ballast (Gitti) Mining Project

Building Stone, Khanda, Boulder, Ballast (Gitti) Mining Project is an approved mining project in Naigawan, Mahoba, Uttar Pradesh. The site covers 4.3 acres. Its stated project cost is ₹71 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 24 Nov 2022).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Building Stone, Khanda, Boulder, Ballast (Gitti) Mining Project is an approved mining project in Naigawan, Mahoba, Uttar Pradesh. The site covers 4.3 acres.

Who is building it?

The applicant is Pushpendra Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 24 Nov 2022), as of 27 Nov 2026.

Where is it?

In Naigawan, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹71 lakh and a site of 4.3 acres.

When was it filed?

The application was filed on 24 Nov 2022.

Project details

StatusEnvironmental approval granted
Status since24 Nov 2022
Application filed24 Nov 2022
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantPushpendra Singh
Land area4.3 acres (1.7 ha)
Project cost₹71 lakh
Village / localityNaigawan
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00225

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.3 acres, this one is larger than 69% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 52.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 34 mining leases have applied within 5 km.

Where it is

Naigawan, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.