What is this project?
Proposed Project of "Granite and Dolostone Ballast Gitty Mining Project" at Gata No. 1021 Mining Lease Area 1.2140 ha., Village- Makarbai, Tehsil – Sadar, District: Mahoba, Uttar Pradesh. by Prop. Shri Jitendra Singh is a proposed mining project in Makarbai, Mahoba, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Jitendra Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Makarbai, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 3 acres.
When was it filed?
The application was filed on 13 Jan 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 8 Oct 2026 |
| Application filed | 13 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jitendra Singh |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Makarbai |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-05040 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 59% of them.
No other mining lease on record is within 500 m of this site; 33 have applied within 5 km.
Where it is
Makarbai, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Granite and Dolostone Ballast Gitty Mining Project at"… — lapsed, 0 m away
- "Granite and Dolostone, Ballast, Gitti Mine" from Village- Makarbai,… — cleared for impact study, 650 m away
- Building Stone-Khanda, Boulder, Ballast(Gitti) — environmental approval granted, 650 m away
- Building Stone, Khanda, Boulder, Ballast (Gitti) Mining Project — environmental approval granted, 750 m away
- Building Stone, Khanda, Boulder, Ballast(Gitti) Mining Project — environmental approval granted, 900 m away
- Building Stone, Khanda, Boulder, Ballast(Gitti) Mining Project — environmental approval granted, 900 m away
- Building Stone or Granite Khanda, Boulder, Ballast (Gitty) Mining Project — environmental approval granted, 1 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 1.2 km away
More from Jitendra Singh in Mahoba
- Proposed Project of "Granite and Dolostone Ballast Gitty Mining Project at"… — lapsed
- Proposed Project of "Granite and Dolostone Ballast Gitti Mining Project" at… — environmental approval granted