One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Mining" Project at Gata No.- 620, 634, Village- Sankraudh Khadar, Tehsil-…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Mar 2023 |
| Application filed | 6 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Smart Mart Stores Private Limited |
| Land area | 17.3 acres (7 ha) |
| Project cost | ₹61 lakh |
| Village / locality | Sankrandh Khader |
| Taluk / tehsil | Khekada |
| District | Baghpat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00302 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Aug 2023 | Environmental approval granted | 17.3 acres | ₹61 lakh |
| Early planning filed 6 Mar 2023 (this page) | Cleared for impact study | 17.3 acres | ₹61 lakh |
In context
17 applications in Baghpat since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 17.3 acres, this one is smaller than 65% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Sankrandh Khader, Khekada, Baghpat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" Project at Gata No.- 620, 634, Village- Sankraudh… — environmental approval granted, 0 m away
- Laying and Construction Of 6", 4" Dia Steel & 125/90/63/32/20 MDPE MM Pipeline… — forest land use approved, 4.4 km away
- Proposed manufacturing unit of Formaldehyde (100 TPD), Urea Formaldehyde… — environmental approval granted, 4.6 km away
- Proposed manufacturing unit of Formaldehyde (100 TPD), Urea Formaldehyde… — cleared for impact study, 4.6 km away
- Diversion For Entry and Exit Approach Road To M/s GOYAL INC "MANUFACTURING… — forest land use approved, 6.4 km away
- Proposal of Diversion of 0.0200 Ha. Protected Forest Land for Access… — lapsed, 6.9 km away
- Diversion of Protected Forest Land for Entry/Exit and Approach Road to… — initial checks, 7 km away
- Khekda Pratham Soil Mining Project — environmental approval granted, 7.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.