Project details
| Status | Forest land use approved |
|---|---|
| Status since | 12 May 2026 |
| Application filed | 11 Feb 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Bagpat Green Energy Private Limited |
| Land area | 3,600 m² |
| Forest land | 3,580 m² |
| Project cost | ₹40 lakh |
| Village / locality | Katha |
| Taluk / tehsil | Khekada |
| District | Baghpat |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-05406 |
In context
5 applications in Baghpat since January 2022 are in the same category (Roads & highways): 3 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Katha, Khekada, Baghpat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed manufacturing unit of Formaldehyde (100 TPD), Urea Formaldehyde… — environmental approval granted, 850 m away
- Proposed manufacturing unit of Formaldehyde (100 TPD), Urea Formaldehyde… — cleared for impact study, 850 m away
- Diversion For Entry and Exit Approach Road To M/s GOYAL INC "MANUFACTURING… — forest land use approved, 4 km away
- Khekda Pratham Soil Mining Project — environmental approval granted, 4.3 km away
- Khekda Pratham Soil Mining Project — withdrawn, 4.3 km away
- "Ordinary Sand Mining" Project at Gata No.- 620, 634, Village- Sankraudh… — environmental approval granted, 4.4 km away
- "Ordinary Sand Mining" Project at Gata No.- 620, 634, Village- Sankraudh… — cleared for impact study, 4.4 km away
- Diversion of Protected Forest Land for Entry/Exit and Approach Road to… — initial checks, 4.5 km away
More from Bagpat Green Energy Private Limited in Baghpat
- Diversion of Protected Forest Land for Laying of Underground Gas Pipeling on… — under forest review
- Permission for Laying of Underground Natural Gas Pipeline by M/S Baghpat Green… — more information requested
- Re-diversion of protected forest land for Permission of Laying and… — lapsed
- Proposed Protected Forest Land To Be Diverted For Entry/Exit To M/S Bagpat… — forest land use approved
- Re-diversion of Protected Forest Land for Proposed Laying and Construction of… — forest land use approved
All 6 Bagpat Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.