Quick answers
What is this project?
6 Lane Kanpur Ring Road starting from NH-19 (Existing Ch. 506+820) near Sachendi village and ends at same point i.e. NH-19 (Existing Ch. 506+820) near Sachendi village by NHAI is an approved road project in Agehra, Unnao, Uttar Pradesh. The site covers 1.5 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Dec 2024), as of 27 Nov 2026.
Where is it?
In Agehra, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹8 lakh and a site of 1.5 acres.
When was it filed?
The application was filed on 14 Aug 2023.
Project details
| Official title | Development of 6 Lane Kanpur Ring Road starting from NH-19 (Existing Ch. 506+820) near Sachendi village and ends at same point i.e. NH-19 (Existing Ch. 506+820) near Sachendi village in Kanpur Nagar district under NHDP Phase-VII in the state of Uttar Pradesh(Total length 93.209km) by M/s National Highways Authority of India |
|---|---|
| Status | Environmental approval granted |
| Status since | 4 Dec 2024 |
| Application filed | 14 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Agehra |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00312 |
In context
7 applications in Unnao since January 2022 are in the same category (Roads & highways): 2 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Agehra, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Development of Integrated Industrial Township "Trans Ganga City" — lapsed, 22.9 km away
- Development of Integrated Industrial Township "Trans Ganga City" — under environmental review, 22.9 km away
- "Ordinary Sand Mining (Category-I)" from Riverbed of Ganga River — under environmental review, 23.2 km away
- Building project by Hori Lal Hotels Pvt. Ltd. — environmental approval granted, 24.6 km away
- Proposed "Ordinary Soil Mining Project" at Gata No.- 194, 195 & 196 — under environmental review, 26.4 km away
- Ordinary Soil Mine — initial checks, 26.6 km away
- Dewarakala Ordinary Earth Mining Project — environmental approval granted, 26.7 km away
- Proposed "Soil Excavation Project" at Gata No. – 92,135,139,120,121,122 & 172… — environmental approval granted, 26.8 km away
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.