Quick answers
What is this project?
"Building Stone (Sand Stone)" Project at Gata No.- 428 (S.No.-36), Village- Dhuria, Tehsil- Chunar, District- Mirzapur, U.P. (Applied Area : 0.646 ha.) Prop.- Shri Vijay Kumar Singh is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Vijai Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 15 Dec 2023), as of 27 Nov 2026.
Where is it?
In Dhuria, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh and a site of 1.6 acres.
When was it filed?
The application was filed on 15 Dec 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Building Stone (Sand Stone)" Project at Gata No.- 428 (S.No.-36), Village- Dhuria,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 15 Dec 2023 |
| Application filed | 15 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vijai Singh |
| Land area | 1.6 acres (0.7 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Dhuria |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00317 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 May 2025 | Environmental approval granted | 1.6 acres | ₹65 lakh |
| Early planning filed 15 Dec 2023 (this page) | Cleared for impact study | 1.6 acres | ₹65 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.6 acres, this one is smaller than 97% of them.
20 other mining leases have applied within 500 m of this site; together with this one they cover 61.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 75 mining leases have applied within 5 km.
Where it is
Dhuria, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Sand Stone)" Project at Gata No.- 428 (S.No.-36), Village-… — environmental approval granted, 0 m away
- Area- 0.809 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project… — environmental approval granted, 50 m away
- Area- 0.809 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project… — cleared for impact study, 50 m away
- Proposed Project of Building Stone-Sandstone Mine at Gata No 428, area 1.012 ha — lapsed, 50 m away
- Building Stone (Sandstone) mine at Gata No.-428, Lease area- 1.818 ha.,… — environmental approval granted, 50 m away
- "Building Stone (Sand Stone)" Project at Gata No.- 428, Village- Dhuria,… — under environmental review, 100 m away
- "Building Stone (Sand Stone)" Project at Gata No.- 428, Village- Dhuria,… — returned to applicant, 100 m away
- Proposed project of Building Stone Sand Stone Mining project at Arazi No. –… — lapsed, 200 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.