Environmental approval grantedMining · Mirzapur, Uttar Pradesh

Area- 0.809 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh.

Area- 0.809 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh is an approved mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2 acres. Its stated project cost is ₹1.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Jun 2025).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Area- 0.809 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh is an approved mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2 acres.

Who is building it?

The applicant is Chandra Devi.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 4 Jun 2025), as of 27 Nov 2026.

Where is it?

In Dhuria, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.8 crore and a site of 2 acres.

When was it filed?

The application was filed on 30 Apr 2025.

Project details

StatusEnvironmental approval granted
Status since4 Jun 2025
Application filed30 Apr 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantChandra Devi
Land area2 acres (0.8 ha)
Project cost₹1.8 crore
Village / localityDhuria
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02906

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Apr 2025 (this page)Environmental approval granted2 acres₹1.8 crore
Early planning filed 14 May 2024Cleared for impact study2 acres₹1.8 crore

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2 acres, this one is smaller than 95% of them.

18 other mining leases have applied within 500 m of this site; together with this one they cover 50.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 78 mining leases have applied within 5 km.

Where it is

Dhuria, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.