One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed sand/morrum mining having lease area-23.0 ha along River Yamuna in Gata No.2/2,…
Project details
| Official title | Riverbed sand/morrum mining having lease area-23.0 ha along River Yamuna in Gata No.2/2, Khand No.03 at Village-Tir Ghumai Gangu, Tehsil-Rajapur, Dist-Chitrakoot Uttar Pradesh of Shri Surendra Kumar Shukla |
|---|---|
| Status | Cleared for impact study |
| Status since | 21 Sept 2023 |
| Application filed | 21 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Surendra Shukla |
| Land area | 56.8 acres (23 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Dhaurahra Bangar |
| Taluk / tehsil | Karwi |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00320 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Feb 2025 | Environmental approval granted | 56.8 acres | ₹1.1 crore |
| Early planning filed 21 Sept 2023 (this page) | Cleared for impact study | 56.8 acres | ₹1.1 crore |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 56.8 acres, this one is larger than 66% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 227.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.
Where it is
Dhaurahra Bangar, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed sand/morrum mining having lease area-23.0 ha along River Yamuna in… — environmental approval granted, 0 m away
- Terms of reference for environment clearance of proposed "Sand/Morrum Mining"… — environmental approval granted, 250 m away
- Terms of reference for environment clearance of proposed "Sand/Morrum Mining"… — cleared for impact study, 250 m away
- Sand/Morum Mining at Yamuna Riverbed — under environmental review, 300 m away
- "Sand/Morrum Mine" located at Gata No. 2/2 (Khand No. 02), over an area of… — environmental approval granted, 300 m away
- "Sand/Morrum Mine" located at Gata No. 2/2 (Khand No. 02), over an area of… — under environmental review, 300 m away
- Tirghumai Gangu Sand/Morrum Mining Project at Riverbed of River Yamuna. — environmental approval granted, 550 m away
- Tirghumai Gangu Sand/Morrum Mining Project at Riverbed of River Yamuna. — cleared for impact study, 550 m away
More from Surendra Shukla in Chitrakoot
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining… — lapsed
- Terms of reference for environment clearance of proposed "Sand/Morrum Mining"… — environmental approval granted
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining… — cleared for impact study
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining… — cleared for impact study
- Terms of reference for environment clearance of proposed "Sand/Morrum Mining"… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.