One of 2 filings for this project. The project's main page, with every filing and where each stands: Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining Project in…
Project details
| Official title | Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining Project in Gata No-715, Khand No-5B, Lease area 2.0240 ha at Village - Gonda, Tehsil-Karwi, District-Chitrakoot, U.P. of Shri Surendra Kumar Shukla |
|---|---|
| Status | Lapsed |
| Status since | 25 Feb 2025 |
| Application filed | 14 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Surendra Shukla |
| Land area | 5 acres (2 ha) |
| Project cost | ₹97 lakh |
| Village / locality | Gonda |
| Taluk / tehsil | Karwi |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01840 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Mar 2024 (this page) | Lapsed | 5 acres | ₹97 lakh |
| Early planning filed 23 Aug 2023 | Cleared for impact study | 5 acres | ₹97 lakh |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 85% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 27.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.
Where it is
Gonda, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to UPEIDA Plans a 15-Kilometre Chitrakoot Link Expressway in Uttar Pradesh (6.2 km away).
Other projects nearby
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining… — cleared for impact study, 0 m away
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining… — cleared for impact study, 150 m away
- "Building Stone Sand Stone (Khanda, Boulder Gitti) Mine" located at Gata No.… — under environmental review, 200 m away
- Environmental Clearance for Proposed Granite-Imarati Patthar (Khanda, Gitty,… — environmental approval granted, 300 m away
- Building Stone (Granite Khanda / Gitti / Boulder / Pahadi Lal Morrum) Mining… — under environmental review, 350 m away
- Building Stone (Granite Khanda / Gitti / Boulder / Pahadi Lal Morrum) Mining… — cleared for impact study, 350 m away
- "Granite Gitti, Khanda / Boulders" Project at Gata No./ Khand No.- 715 / 09,… — environmental approval granted, 450 m away
- "Granite Gitti, Khanda / Boulders" Project at Gata No./ Khand No.- 715 / 09,… — cleared for impact study, 450 m away
More from Surendra Shukla in Chitrakoot
- Riverbed sand/morrum mining having lease area-23.0 ha along River Yamuna in… — environmental approval granted
- Terms of reference for environment clearance of proposed "Sand/Morrum Mining"… — environmental approval granted
- Riverbed sand/morrum mining having lease area-23.0 ha along River Yamuna in… — cleared for impact study
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Sandstone Mining… — cleared for impact study
- Terms of reference for environment clearance of proposed "Sand/Morrum Mining"… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.