Cleared for impact studyMining · Mirzapur, Uttar Pradesh

Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No. 09, Area 2.02 ha

Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No. 09, Area 2.02 ha is a proposed mining project in Marfa, Chunar, Mirzapur, Uttar Pradesh. The site covers 5 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 7 Jun 2023).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No. 09, Area 2.02 ha is a proposed mining project in Marfa, Chunar, Mirzapur, Uttar Pradesh. The site covers 5 acres.

Who is building it?

The applicant is Amit Sonkar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 7 Jun 2023), as of 27 Nov 2026.

Where is it?

In Marfa, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹55 lakh and a site of 5 acres.

When was it filed?

The application was filed on 7 Jun 2023.

One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No. 09, Area…

Project details

Official titleProposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No. 09, Area 2.02 ha in Village- Madpha, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh
StatusCleared for impact study
Status since7 Jun 2023
Application filed7 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAmit Sonkar
Land area5 acres (2 ha)
Project cost₹55 lakh
Village / localityMarfa
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00434

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Jan 2026Environmental approval granted5 acres₹55 lakh
Amendment filed 12 May 2025Cleared for impact study5 acres₹55 lakh
New project filed 25 Apr 2024Returned to applicant5 acres₹55 lakh
Early planning filed 7 Jun 2023 (this page)Cleared for impact study5 acres₹55 lakh

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5 acres, this one is larger than 70% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 11.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 21 mining leases have applied within 5 km.

Where it is

Marfa, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.