Quick answers
What is this project?
Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No. 09, Area 2.02 ha is a proposed mining project in Marfa, Chunar, Mirzapur, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Amit Sonkar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Sept 2025), as of 27 Nov 2026.
Where is it?
In Marfa, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh and a site of 5 acres.
When was it filed?
The application was filed on 12 May 2025.
One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No. 09, Area…
Project details
| Official title | Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No. 09, Area 2.02 ha in Village- Madpha, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh |
|---|---|
| Status | Cleared for impact study |
| Status since | 26 Sept 2025 |
| Application filed | 12 May 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Amit Sonkar |
| Land area | 5 acres (2 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Marfa |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02629 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jan 2026 | Environmental approval granted | 5 acres | ₹55 lakh |
| Amendment filed 12 May 2025 (this page) | Cleared for impact study | 5 acres | ₹55 lakh |
| New project filed 25 Apr 2024 | Returned to applicant | 5 acres | ₹55 lakh |
| Early planning filed 7 Jun 2023 | Cleared for impact study | 5 acres | ₹55 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5 acres, this one is larger than 70% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 11.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 21 mining leases have applied within 5 km.
Where it is
Marfa, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No.… — environmental approval granted, 0 m away
- Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No.… — returned to applicant, 50 m away
- Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No.… — cleared for impact study, 50 m away
- Building Stone (Sandstone) Mine at Gata No. 187 Mi, Area – 1.21 Ha, Village -… — environmental approval granted, 100 m away
- Building Stone (Sandstone) Mine at Gata No. 187 Mi, Area – 1.21 Ha, Village -… — cleared for impact study, 100 m away
- Madpha Building stone Sand Stone Mining project — cleared for impact study, 300 m away
- Madpha Building stone Sand Stone Mining project — environmental approval granted, 300 m away
- Building Stone (Sandstone) Mine — environmental approval granted, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.