One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Existing Standalone Grinding Unit with Cement production capacity from 1.0…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Oct 2023 |
| Application filed | 30 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/s. UltraTech Cement Ltd. |
| Land area | 21.2 acres (8.6 ha) |
| Project cost | ₹519.2 crore |
| Village / locality | Kanaudha |
| Taluk / tehsil | Tanda |
| District | Ambedkar Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00435 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 4 Apr 2024 | Environmental approval granted | 21.2 acres | ₹519.2 crore |
| Early planning filed 30 Oct 2023 (this page) | Cleared for impact study | 21.2 acres | ₹519.2 crore |
In context
5 applications in Ambedkar Nagar since January 2022 are in the same category (Industry): 3 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Kanaudha, Tanda, Ambedkar Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Standalone Grinding Unit with Cement production capacity… — environmental approval granted, 0 m away
- Proposed OFC cable by BSNL Ambedkarnagar, on Akbarpur-Tanda road (NH1-128) — lapsed, 6.8 km away
- "Ordinary Sand Category I Mining" from Riverbed of Ghaghra River — initial checks, 7.6 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — environmental approval granted, 7.6 km away
- Proposed Project of Ordinary Sand mining from Riverbed of Ghaghra River… — environmental approval granted, 8.2 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 12 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to HPCL… — forest land use approved, 14.6 km away
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.