Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ghaghra River at Village- Majha Kalan, Gata No.- 553, Lease Area- 2.06 ha., Tehsil- Basti Sadar, District- Basti, Uttar Pradesh, Project Proponent- M/s Shiv Construction (Prop.- Shri Vijay Pratap Singh) |
|---|---|
| Status | Environmental approval granted |
| Status since | 29 Apr 2025 |
| Application filed | 28 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vijay Pratap Singh |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Majha Kala |
| Taluk / tehsil | Tanda |
| District | Ambedkar Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01429 |
In context
12 applications in Ambedkar Nagar since January 2022 are in the same category (Mining): 7 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. At 2.7 acres, this one is smaller than 92% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Majha Kala, Tanda, Ambedkar Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Category I Mining" from Riverbed of Ghaghra River — initial checks, 0 m away
- Proposed Project of Ordinary Sand mining from Riverbed of Ghaghra River… — environmental approval granted, 900 m away
- Proposed OFC cable by BSNL Ambedkarnagar, on Akbarpur-Tanda road (NH1-128) — lapsed, 6.9 km away
- Expansion of Existing Standalone Grinding Unit with Cement production capacity… — environmental approval granted, 7.6 km away
- Expansion of Existing Standalone Grinding Unit with Cement production capacity… — cleared for impact study, 7.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 13 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 16.8 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 17.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.