One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for proposed Establishment of 100 KLPD Capacity Grain based…
Project details
| Official title | Environmental Clearance for proposed Establishment of 100 KLPD Capacity Grain based Distillery along with 2.7 MW Co-generation Power Plant at Village – Ghanshyampur, Post – Azizpur, Nigohi Block, Tehsil – Tilhar, District – Shahjahanpur – 242407, UP, by M/s Shri Gurukripa GNG Private Limited |
|---|---|
| Status | More information requested |
| Status since | 8 Aug 2023 |
| Application filed | 8 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Pulkit Narang |
| Land area | 29.2 acres (11.8 ha) |
| Project cost | ₹70 crore |
| Village / locality | Ghanshyampur |
| Taluk / tehsil | Tilhar |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00460 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Feb 2024 | Environmental approval granted | 29.2 acres | ₹70 crore |
| Early planning filed 8 Aug 2023 (this page) | More information requested | 29.2 acres | ₹70 crore |
In context
29 applications in Shahjahanpur since January 2022 are in the same category (Industry): 25 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.2 acres, this one is larger than 59% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghanshyampur, Tilhar, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for proposed Establishment of 100 KLPD Capacity Grain… — environmental approval granted, 0 m away
- No Increase in Pollution Load Certificate for Proposed Expansion of Existing… — initial checks, 600 m away
- Expansion of Molasses based distillery from 110 KLPD to 360 KLPD Multi Feed… — returned to applicant, 9.4 km away
- Expansion of Molasses based distillery from 110 KLPD to 360 KLPD Multi Feed… — cleared for impact study, 9.4 km away
- Widening/Upgradation to four lane configuration of Shahjahanpur-Bisalpur… — more information requested, 9.6 km away
- Proposed 300 KLPD Grain based Ethanol plant — environmental approval granted, 9.7 km away
- Proposed 300 KLPD B-Heavy Molasses/C-Heavy Molasses/Cane Syrup/Cane… — returned to applicant, 9.7 km away
- Proposed 300 KLPD Grain based Ethanol plant — environmental approval granted, 9.7 km away
About this information