Project details
| Official title | Environmental Clearance for proposed Establishment of 100 KLPD Capacity Grain based Distillery along with 2.7 MW Co-generation Power Plant at Village – Ghanshyampur, Post – Azizpur, Nigohi Block, Tehsil – Tilhar, District – Shahjahanpur – 242407, UP, by M/s Shri Gurukripa GNG Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 May 2024 |
| Application filed | 4 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Pulkit Narang |
| Land area | 29.2 acres (11.8 ha) |
| Project cost | ₹70 crore |
| Village / locality | Ghanshyampur |
| Taluk / tehsil | Tilhar |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01899 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Feb 2024 (this page) | Environmental approval granted | 29.2 acres | ₹70 crore |
| Early planning filed 8 Aug 2023 | More information requested | 29.2 acres | ₹70 crore |
In context
29 applications in Shahjahanpur since January 2022 are in the same category (Industry): 25 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.2 acres, this one is larger than 59% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghanshyampur, Tilhar, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for proposed Establishment of 100 KLPD Capacity Grain… — more information requested, 0 m away
- No Increase in Pollution Load Certificate for Proposed Expansion of Existing… — initial checks, 600 m away
- Expansion of Molasses based distillery from 110 KLPD to 360 KLPD Multi Feed… — returned to applicant, 9.4 km away
- Expansion of Molasses based distillery from 110 KLPD to 360 KLPD Multi Feed… — cleared for impact study, 9.4 km away
- Widening/Upgradation to four lane configuration of Shahjahanpur-Bisalpur… — more information requested, 9.6 km away
- Proposed 300 KLPD Grain based Ethanol plant — environmental approval granted, 9.7 km away
- Proposed 300 KLPD B-Heavy Molasses/C-Heavy Molasses/Cane Syrup/Cane… — returned to applicant, 9.7 km away
- Proposed 300 KLPD Grain based Ethanol plant — environmental approval granted, 9.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.