One of 2 filings for this project. The project's main page, with every filing and where each stands: Group Housing project at Plot No & Khasra No-146 & 199, Village-Morti, Dist-Ghaziabad,…
Project details
| Status | Initial checks |
|---|---|
| Status since | 18 Jun 2024 |
| Application filed | 18 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Javin Construction Private Limited |
| Land area | 3.4 acres (1.4 ha) |
| Project cost | ₹207 crore |
| Village / locality | Morti |
| Taluk / tehsil | Ghaziabad |
| District | Ghaziabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00474 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Jun 2024 (this page) | Initial checks | 3.4 acres | ₹207 crore |
| Validity extension filed 18 Jun 2024 | Environmental approval granted | 3.4 acres | ₹207 crore |
In context
154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.4 acres, this one is smaller than 59% of them.
35 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Morti, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Group Housing project at Plot No & Khasra No-146 & 199, Village-Morti,… — environmental approval granted, 0 m away
- Proposed Group Housing Project at KH No. 953, Village-Noor Nagar, Ghaziabad… — environmental approval granted, 400 m away
- Proposed Expansion of Group Housing Project "Bankey Bihari Sharnam" at Khasra… — initial checks, 650 m away
- Proposed Group Housing Project at Khasra No.1014m, 1015m, 1018m, 1019, 1020,… — environmental approval granted, 750 m away
- Proposed Group Housing Project at Khasra No.1014m, 1015m, 1018m, 1019, 1020,… — cleared for impact study, 750 m away
- Proposed Group Housing Project at Khasra No.1014m, 1015m, 1018m, 1019, 1020,… — returned to applicant, 750 m away
- Uninav Utopia — environmental approval granted, 800 m away
- Proposed Group Housing Project at Khasra No. 544 Min, Village-Noor Nagar,… — lapsed, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.