Quick answers
What is Punawali Kalan Khanda/Boulder- Gitti/Bailast Mining project?
Punawali Kalan Khanda/Boulder- Gitti/Bailast Mining project is a proposed mining project in Punawali Kalan, Jhansi, Uttar Pradesh. The site covers 4 acres.
Who is building it?
The applicant is Shashi.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Punawali Kalan, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹66 lakh and a site of 4 acres.
When was it filed?
The application was filed on 11 Aug 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 11 Aug 2023 |
| Application filed | 11 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shashi |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹66 lakh |
| Village / locality | Punawali Kalan |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00496 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4 acres, this one is smaller than 75% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Punawali Kalan, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Entry/Exit of approach to… — forest land use approved, 4.7 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — under forest review, 5.8 km away
- Proposed Township and area development Project "Sheheri Vistarikaran Yojna",… — environmental approval granted, 5.8 km away
- Proposed Township and area development Project "Sheheri Vistarikaran Yojna",… — cleared for impact study, 5.8 km away
- Proposed Township Sheheri Vistarikaran Yojna, Village-Rund Karari,Tehsil and… — withdrawn, 5.8 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 6 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 6 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested, 6.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.