Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a lapsed fuel station in Ambabai, Jhansi, Uttar Pradesh. The site covers 1.1 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
No. The application was lapsed on 7 Aug 2026, so it is no longer under consideration.
Where is it?
In Ambabai, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 1.1 acres and 2,170 m² of forest land.
When was it filed?
The application was filed on 15 Apr 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet at Village:-Ambabai, Tehsil:-Jhansi, District:- Jhansi. |
|---|---|
| Status | Lapsed |
| Status since | 7 Aug 2026 |
| Application filed | 15 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1.1 acres (0.4 ha) |
| Forest land | 2,170 m² |
| Project cost | ₹60 lakh |
| Village / locality | Ambabai |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05440 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 May 2025 | More information requested | 2.8 acres | ₹55 lakh |
| New project filed 15 Apr 2025 (this page) | Lapsed | 1.1 acres | ₹60 lakh |
In context
31 applications in Jhansi since January 2022 are in the same category (Fuel stations): 13 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 1.1 acres, this one is larger than 58% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambabai, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested, 450 m away
- Proposed Protected Forest Land to be diverted for Entry/Exit of approach to… — forest land use approved, 3.6 km away
- Proposed Township and area development Project "Sheheri Vistarikaran Yojna",… — environmental approval granted, 3.8 km away
- Proposed Township and area development Project "Sheheri Vistarikaran Yojna",… — cleared for impact study, 3.8 km away
- Proposed Township Sheheri Vistarikaran Yojna, Village-Rund Karari,Tehsil and… — withdrawn, 3.8 km away
- Punawali Kalan Khanda/Boulder- Gitti/Bailast Mining project — more information requested, 6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — under forest review, 6.4 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 6.7 km away
More from Indian Oil Corporation Limited (IOCL) in Jhansi
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — lapsed
- Proposed protected forest land to be diverted for Entry/Exit Approach to IOCL… — lapsed
15 Indian Oil Corporation (IOCL) projects in Jhansi
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.