What is Developing? Open the mapMap

Environmental approval grantedWaste management · Varanasi, Uttar Pradesh

Common Bio-Medical Waste Treatment Facility using latest Plasma Pyrolysis technology

Common Bio-Medical Waste Treatment Facility using latest Plasma Pyrolysis technology is an approved waste management project in Sir Govardhanpur, Sadar, Varanasi, Uttar Pradesh. The site covers 1 acre. Its stated project cost is ₹6.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Aug 2023).

See it on the live map All projects in Varanasi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleSetting up of Common Bio-Medical Waste Treatment Facility using latest Plasma Pyrolysis technology at Village Naipura kalan, Varanasi, Uttar Pradesh by M/s Mahamana Pandit Madan Mohan Malaviya Cancer Centre (a unit of Tata Memorial Centre)
StatusEnvironmental approval granted
Status since21 Aug 2023
Application filed21 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorWaste management
ApplicantMahamana Pandit Madan Mohan Malaviya Cancer Centre
Land area4,000 m²
Project cost₹6.5 crore
Village / localitySir Govardhanpur
Taluk / tehsilSadar
DistrictVaranasi
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00595

In context

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sir Govardhanpur, Sadar, Varanasi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Varuna Elevated Corridor: A ₹10,998-Crore Highway in Varanasi (12.5 km away).

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.