Quick answers
What is this project?
Proposed expansion of existing sugar unit from 4850 TCD to 8000 TCD along without change in co gen power 19.80 MW within existing premises is an approved industrial project in Parsaindi, Kaiserganj, Bahraich, Uttar Pradesh. The site covers 39.6 acres.
Who is building it?
The applicant is Parle Biscuits Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Nov 2023), as of 27 Nov 2026.
Where is it?
In Parsaindi, Kaiserganj, Bahraich, Uttar Pradesh.
How big is it?
It has a stated cost of ₹308 crore and a site of 39.6 acres.
When was it filed?
The application was filed on 6 Nov 2023.
Project details
| Official title | Proposed expansion of existing sugar unit from 4850 TCD to 8000 TCD along without change in co gen power 19.80 MW within existing premises at Village: Parsendi, Tehsil: Kaisarganj District: Bahraich (Uttar Pradesh.) by M/s Parle Biscuits Private Limited, Unit: Sugar |
|---|---|
| Status | Environmental approval granted |
| Status since | 6 Nov 2023 |
| Application filed | 6 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Parle Biscuits Private Limited |
| Land area | 39.6 acres (16 ha) |
| Project cost | ₹308 crore |
| Village / locality | Parsaindi |
| Taluk / tehsil | Kaiserganj |
| District | Bahraich |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00603 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Parsaindi, Kaiserganj, Bahraich, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Improvement and Up-gradation of NH-927 Stretch from Barabanki to Bahraich… — more information requested, 3.1 km away
- Diversion of Protected Forest Land Proposed For Diversion For Entry/Exit… — under forest review, 8.5 km away
- Ordinary Soil Excavation Mine — environmental approval granted, 14.9 km away
- Ordinary Soil Excavation Project — environmental approval granted, 15 km away
- Re-diversion for Jio Digital Fibre Private Limited Project for Laying of… — lapsed, 16.9 km away
- Proposal of re-diversion for Jio Digital Fibre Private Limited Project for… — more information requested, 17.3 km away
- Ordinary Earth Excavation, Village-Jadaupur, Tehsil-Mahasi, District-Bahraich,… — environmental approval granted, 17.5 km away
- Ordinary Soil Excavation Mine — environmental approval granted, 17.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.