Environmental approval grantedMining · Kaushambi, Uttar Pradesh

River Bed Sand/Morrum Mining Having Lease Area 25.00 Ha Along River Yamuna in Khand No. 16/11 to 16/14

River Bed Sand/Morrum Mining Having Lease Area 25.00 Ha Along River Yamuna in Khand No. 16/11 to 16/14 is an approved mining project in Ramnagar, Manjhanpur, Kaushambi, Uttar Pradesh. The site covers 61.8 acres. Its stated project cost is ₹1.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Oct 2023).

See it on the live map All projects in Kaushambi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

River Bed Sand/Morrum Mining Having Lease Area 25.00 Ha Along River Yamuna in Khand No. 16/11 to 16/14 is an approved mining project in Ramnagar, Manjhanpur, Kaushambi, Uttar Pradesh. The site covers 61.8 acres.

Who is building it?

The applicant is Arun Tripathi.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Oct 2023), as of 27 Nov 2026.

Where is it?

In Ramnagar, Manjhanpur, Kaushambi, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.4 crore and a site of 61.8 acres.

When was it filed?

The application was filed on 26 Oct 2023.

Project details

Official titleRiver Bed Sand/Morrum Mining Having Lease Area 25.00 Ha Along River Yamuna in Khand No. 16/11 to 16/14 at Village- Ramnagar (Mahewa), Tehsil-Manjhanpur, District-Kaushambi U. P. of Shri Arun Kumar Tripathi.
StatusEnvironmental approval granted
Status since26 Oct 2023
Application filed26 Oct 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantArun Tripathi
Land area61.8 acres (25 ha)
Project cost₹1.4 crore
Village / localityRamnagar
Taluk / tehsilManjhanpur
DistrictKaushambi
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00607

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 26 Oct 2023 (this page)Environmental approval granted61.8 acres₹1.4 crore
Early planning filed 28 Jan 2023Cleared for impact study61.8 acres₹1.4 crore

In context

32 applications in Kaushambi since January 2022 are in the same category (Mining): 20 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 61.8 acres, this one is larger than 94% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Ramnagar, Manjhanpur, Kaushambi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.