Quick answers
What is Dorma Kachhar and Shahpur Kachhar Morrum Mining Project?
Dorma Kachhar and Shahpur Kachhar Morrum Mining Project is a lapsed mining project in Dorma Kachhar, Manjhanpur, Kaushambi, Uttar Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Durgesh Sahu.
Has it been approved?
No. The application was lapsed on 6 Feb 2026, so it is no longer under consideration.
Where is it?
In Dorma Kachhar, Manjhanpur, Kaushambi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 49.4 acres.
When was it filed?
The application was filed on 31 Mar 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Dorma Kachhar and Shahpur Kachhar Morrum Mining Project
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Feb 2026 |
| Application filed | 31 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Durgesh Sahu |
| Land area | 49.4 acres (20 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Dorma Kachhar |
| Taluk / tehsil | Manjhanpur |
| District | Kaushambi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02628 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Mar 2025 (this page) | Lapsed | 49.4 acres | ₹80 lakh |
| Early planning filed 27 Jan 2023 | Cleared for impact study | 49.4 acres | ₹80 lakh |
In context
32 applications in Kaushambi since January 2022 are in the same category (Mining): 20 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 49.4 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Dorma Kachhar, Manjhanpur, Kaushambi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dorma Kachhar and Shahpur Kachhar Morrum Mining Project — cleared for impact study, 0 m away
- Morrum Mining at Yamuna River Bed — environmental approval granted, 1.1 km away
- Morrum Mining at Yamuna River Bed — cleared for impact study, 1.1 km away
- "Morrum Mining at Yamuna River Bed" — cleared for impact study, 5.8 km away
- "Morrum Mining at Yamuna River Bed" — environmental approval granted, 5.8 km away
- "MORAM MINING AT YAMUNA RIVER BED" having area: 10.0 ha., Gata Sankhya 01 and… — under environmental review, 6.1 km away
- "MORAM MINING AT YAMUNA RIVER BED" having area: 10.0 ha., Gata Sankhya 01 and… — cleared for impact study, 6.1 km away
- River Bed Sand/Morrum Mining Having Lease Area 25.00 Ha Along River Yamuna in… — environmental approval granted, 6.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.