Quick answers
What is this project?
Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 339 (Khand No.- 34), Village- Daharra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.214 ha.) is a proposed mining project in Daharra, Mahoba, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Yogendra Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Mar 2023), as of 27 Nov 2026.
Where is it?
In Daharra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹68 lakh and a site of 3 acres.
When was it filed?
The application was filed on 11 Mar 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Mar 2023 |
| Application filed | 11 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Yogendra Singh |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹68 lakh |
| Village / locality | Daharra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00657 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Sept 2023 | Environmental approval granted | 3 acres | ₹68 lakh |
| Early planning filed 11 Mar 2023 (this page) | Cleared for impact study | 3 acres | ₹68 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 59% of them.
10 other mining leases have applied within 500 m of this site; together with this one they cover 33.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 37 mining leases have applied within 5 km.
Where it is
Daharra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — environmental approval granted, 0 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at… — environmental approval granted, 150 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at… — cleared for impact study, 150 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 150 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 150 m away
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 339… — environmental approval granted, 150 m away
- Proposed "Granite & Dolostone Bailast (Gitti)" Project at Gata No.- 339 (Khand… — under environmental review, 250 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 250 m away
More from Yogendra Singh in Mahoba
- Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 199/1 (Khand… — environmental approval granted
- Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 199/1 (Khand… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.