Cleared for impact studyMining · Mahoba, Uttar Pradesh

Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 339 (Khand No.- 34), Village- Daharra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.214 ha.)

Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 339 (Khand No.- 34), Village- Daharra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.214 ha.) is a proposed mining project in Daharra, Mahoba, Uttar Pradesh. The site covers 3 acres. Its stated project cost is ₹68 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 11 Mar 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 339 (Khand No.- 34), Village- Daharra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 1.214 ha.) is a proposed mining project in Daharra, Mahoba, Uttar Pradesh. The site covers 3 acres.

Who is building it?

The applicant is Yogendra Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 11 Mar 2023), as of 27 Nov 2026.

Where is it?

In Daharra, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹68 lakh and a site of 3 acres.

When was it filed?

The application was filed on 11 Mar 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata…

Project details

StatusCleared for impact study
Status since11 Mar 2023
Application filed11 Mar 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantYogendra Singh
Land area3 acres (1.2 ha)
Project cost₹68 lakh
Village / localityDaharra
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00657

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Sept 2023Environmental approval granted3 acres₹68 lakh
Early planning filed 11 Mar 2023 (this page)Cleared for impact study3 acres₹68 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 59% of them.

10 other mining leases have applied within 500 m of this site; together with this one they cover 33.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 37 mining leases have applied within 5 km.

Where it is

Daharra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.