What is Developing? Open the mapMap

Environmental approval grantedMining · Mahoba, Uttar Pradesh

Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 199/1 (Khand No.-05 New), Village- Kumhadaura Maaf, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.5000 ha.), Shri Yogendra Singh

Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 199/1 (Khand No.-05 New), Village- Kumhadaura Maaf, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.5000 ha.), Shri Yogendra Singh is an approved mining project in Kumhraura Muaf, Mahoba, Uttar Pradesh. The site covers 1.2 acres. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Oct 2026).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 199/1 (Khand No.-05 New), Village- Kumhadaura Maaf, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.5000 ha.), Shri Yogendra Singh is an approved mining project in Kumhraura Muaf, Mahoba, Uttar Pradesh. The site covers 1.2 acres.

Who is building it?

The applicant is Yogendra Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Oct 2026), as of 27 Nov 2026.

Where is it?

In Kumhraura Muaf, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh and a site of 1.2 acres.

When was it filed?

The application was filed on 28 Jun 2026.

Project details

StatusEnvironmental approval granted
Status since17 Oct 2026
Application filed28 Jun 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantYogendra Singh
Land area1.2 acres (0.5 ha)
Project cost₹65 lakh
Village / localityKumhraura Muaf
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04225

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 28 Jun 2026 (this page)Environmental approval granted1.2 acres₹65 lakh
Early planning filed 5 Sept 2025Cleared for impact study1.2 acres₹65 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 94% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 12.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.

Where it is

Kumhraura Muaf, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Yogendra Singh in Mahoba

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.