Quick answers
What is this project?
"Building Stone (Sand Stone)" Project at Gata No.- 428, Village- Dhuria, Tehsil- Chunar, District- Mirzapur, U.P. (Leased Area : 1.01 ha./ 2.50 Acre) Prop.- Shri Harilal Prajapati S/o Shri Motiram Prajapati & Shri Motiram Prajapati S/o Shri Shivnath Prajapati is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Hari Prajapati.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Dec 2023), as of 27 Nov 2026.
Where is it?
In Dhuria, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹69 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 22 Dec 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Dec 2023 |
| Application filed | 22 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Hari Prajapati |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹69 lakh |
| Village / locality | Dhuria |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00706 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.
32 other mining leases have applied within 500 m of this site; together with this one they cover 104 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 71 mining leases have applied within 5 km.
Where it is
Dhuria, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Stone Quartizite Ballast (Gitti) Mining project at Arazi No. – 428, Area-… — under environmental review, 0 m away
- Project of "Building Stone Sandstone (Gitty, Boulder, Slab) Mining Project"… — environmental approval granted, 100 m away
- Project of "Building Stone Sandstone (Gitty, Boulder, Slab) Mining Project"… — cleared for impact study, 100 m away
- Dhuriya Building stone Sand Stone Mining project — environmental approval granted, 100 m away
- Dhuriya Building stone Sand Stone Mining project — cleared for impact study, 100 m away
- Building Stone (Sandstone) Mine at Sl. No. 22, Gata No. 428, Area-0.505 Ha.,… — environmental approval granted, 100 m away
- Proposed Dhuria Building Stone (Sandstone) Mining Project At Arazi No. 428,… — environmental approval granted, 100 m away
- Dhuria Building Stone (Sandstone) Mining Project At Gata no. 428, Kramank no.… — environmental approval granted, 150 m away
More from Hari Prajapati in Mirzapur
- "Building Stone (Sand Stone)" Project at Gata No.- 428, Village- Dhuria,… — lapsed
- "Building Stone (Sand Stone)" Project at Gata No.- 428, Village- Dhuria,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.