Under environmental reviewMining · Mirzapur, Uttar Pradesh

Sand Stone Quartizite Ballast (Gitti) Mining project at Arazi No. – 428, Area- 1.0120 ha, Village- Dhuriya, Tehsil- Chunar, District- Mirzapur (U.P.) by Prop. Shri Anil Singh

Sand Stone Quartizite Ballast (Gitti) Mining project at Arazi No. – 428, Area- 1.0120 ha, Village- Dhuriya, Tehsil- Chunar, District- Mirzapur (U.P.) by Prop. Shri Anil Singh is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres. Its stated project cost is ₹72 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 30 Oct 2026).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Stone Quartizite Ballast (Gitti) Mining project at Arazi No. – 428, Area- 1.0120 ha, Village- Dhuriya, Tehsil- Chunar, District- Mirzapur (U.P.) by Prop. Shri Anil Singh is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.

Who is building it?

The applicant is Anil Kumar Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Dhuria, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹72 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 30 Oct 2026.

Project details

StatusUnder environmental review
Status since30 Oct 2026
Application filed30 Oct 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAnil Kumar Singh
Land area2.5 acres (1 ha)
Project cost₹72 lakh
Village / localityDhuria
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-07467

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.

32 other mining leases have applied within 500 m of this site; together with this one they cover 104 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 71 mining leases have applied within 5 km.

Where it is

Dhuria, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.