What is Developing? Open the mapMap

Cleared for impact studyMining · Banda, Uttar Pradesh

Proposed riverbed sand/morrum mining project from Ken River of M/s Glint Trading Private Limited

Proposed riverbed sand/morrum mining project from Ken River of M/s Glint Trading Private Limited is a proposed mining project in Hathethi Purwa, Banda, Uttar Pradesh. The site covers 9 acres. Its stated project cost is ₹3.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 12 Aug 2023).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed riverbed sand/morrum mining project from Ken River of M/s Glint Trading Private Limited is a proposed mining project in Hathethi Purwa, Banda, Uttar Pradesh. The site covers 9 acres.

Who is building it?

The applicant is Glint Trading Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 12 Aug 2023), as of 27 Nov 2026.

Where is it?

In Hathethi Purwa, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹3.5 crore and a site of 9 acres.

When was it filed?

The application was filed on 12 Aug 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Ken River of M/s Glint Trading Private…

Project details

StatusCleared for impact study
Status since12 Aug 2023
Application filed12 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantGlint Trading Private Limited
Land area9 acres (3.6 ha)
Project cost₹3.5 crore
Village / localityHathethi Purwa
Taluk / tehsilBanda
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00710

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 15 Oct 2024Environmental approval granted9 acres₹3.5 crore
Early planning filed 12 Aug 2023 (this page)Cleared for impact study9 acres₹3.5 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9 acres, this one is smaller than 82% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 19 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.

Where it is

Hathethi Purwa, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Glint Trading Private Limited in Banda

All 3 Glint Trading projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.