Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Ken River of M/s Wengty Trading Private Limited Proprietor- Shri Deepak Sharma, located at Gata No. 3061 Mi (Khand No. 01), Village- Hateti Purwa, Tehsil- Banda, District- Banda, Uttar-Pradesh is an approved mining project in Hathethi Purwa, Banda, Uttar Pradesh. The site covers 10 acres.
Who is building it?
The applicant is Wengty Trading Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Apr 2025), as of 27 Nov 2026.
Where is it?
In Hathethi Purwa, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.5 crore and a site of 10 acres.
When was it filed?
The application was filed on 5 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Apr 2025 |
| Application filed | 5 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Wengty Trading Private Limited |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹3.5 crore |
| Village / locality | Hathethi Purwa |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01745 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Nov 2024 (this page) | Environmental approval granted | 10 acres | ₹3.5 crore |
| Early planning filed 12 Aug 2023 | Cleared for impact study | 10 acres | ₹3.5 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10 acres, this one is smaller than 81% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 19 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Hathethi Purwa, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed sand/morrum mining project from Ken River of M/s Wengty… — cleared for impact study, 0 m away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Glint… — environmental approval granted, 250 m away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Glint… — cleared for impact study, 250 m away
- Proposed riverbed sand/morrum mining project from Ken River of Uncle And Sons… — lapsed, 550 m away
- Proposed riverbed sand/morrum mining project from Ken River of Uncle And Sons… — cleared for impact study, 550 m away
- Proposed River Bed Sand/Morrum Mining having lease area 10.0 ha (24.71 acre)… — environmental approval granted, 1 km away
- Proposed River Bed Sand/Morrum Mining having lease area 10.0 ha (24.71 acre)… — cleared for impact study, 1 km away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Ganchha, Gata No.-… — initial checks, 1 km away
More from Wengty Trading Private Limited in Banda
- Proposed riverbed sand/morrum mining project from Yamuna River of Wengty… — environmental approval granted
- Proposed riverbed sand/morrum mining project from Yamuna River of Wengty… — cleared for impact study
All 4 Wengty Trading projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.