Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Sept 2023 |
| Application filed | 21 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rudra Mining and Company |
| Land area | 30 acres (12.2 ha) |
| Project cost | ₹11.4 crore |
| Village / locality | Mahalpur |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00775 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Sept 2023 (this page) | Environmental approval granted | 30 acres | ₹11.4 crore |
| Early planning filed 15 May 2023 | Cleared for impact study | 30 acres | ₹11.4 crore |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 30 acres, this one is larger than 89% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 46.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 25 mining leases have applied within 5 km.
Where it is
Mahalpur, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhagwa Morrum Mining Project on Sone River — cleared for impact study, 0 m away
- Sand/Morrum Mining project at Arazi No. 15 Enya, 20 Ga, Area- 6.575 ha,… — initial checks, 400 m away
- Sand/Morrum Mining project at Arazi No. 15 Enya, 20 Ga, Area- 6.575 ha,… — cleared for impact study, 400 m away
- Proposed Project of Khanda-Boulder (Dolostone) Mine at Gata No… — environmental approval granted, 1.2 km away
- Submission of Form-1, Pre Feasibility Report (PFR), EMP, and Approved Mining… — lapsed, 2 km away
- Proposed "Gitti/ Boulder (Dolostone)" Project at Gata No.- 257, Village-… — environmental approval granted, 2 km away
- Area- 6.0 Ha on Rihand River for Sand/Morrum Mining Project at Khand No. A,… — lapsed, 2.1 km away
- Area- 6.0 Ha on Rihand River for Sand/Morrum Mining Project at Khand No. A,… — cleared for impact study, 2.1 km away
All 4 Rudra Mining and Company projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.