Project details
| Official title | Proposed 100 KLPD Grain Based Distillery along with 2.5 MW Co-generation Power Plant under Ethanol Blending Petrol Program (EBP) at Khasra No. 429, 431, 434, 435, 437, 438, 439, 440, 442, 443, 444, 445,454, 460, 461 Village Shivrukh Kalan, Tehsil Mahmudabad, Sitapur District, Uttar Pradesh by M/s. Shradhanika India Corporation. |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Feb 2023 |
| Application filed | 15 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Shradhanika India Corporation |
| Land area | 16.6 acres (6.7 ha) |
| Project cost | ₹148.4 crore |
| Village / locality | Shivrukhi Kalan |
| Taluk / tehsil | Mahmudabad |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00776 |
In context
12 applications in Sitapur since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 16.6 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shivrukhi Kalan, Mahmudabad, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 4.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 7.5 km away
- No Increase in Pollution Load for Operation of Existing Distillery on C Heavy… — initial checks, 7.9 km away
- Expansion of Existing 81 Kld Distillery Upto 166 Kld B-Heavy/Cane Syrup Based… — environmental approval granted, 7.9 km away
- Expansion of Existing Sugar Unit From 8500 Tcd to 12000 Tcd Without Change in… — environmental approval granted, 8 km away
- Expansion of Existing Sugar Unit From 8500 Tcd to 12000 Tcd Without Change in… — cleared for impact study, 8 km away
- Ordinary Earth Mining Project Gata No.-517, 989Aa — returned to applicant, 8.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 9.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.