Quick answers
What is this project?
"Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 712, Village- Chhikahra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 2.024 ha.) is an approved mining project in Chhikahra, Mahoba, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Kamlesh Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Aug 2023), as of 27 Nov 2026.
Where is it?
In Chhikahra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹74 lakh and a site of 5 acres.
When was it filed?
The application was filed on 14 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Aug 2023 |
| Application filed | 14 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kamlesh Singh |
| Land area | 5 acres (2 ha) |
| Project cost | ₹74 lakh |
| Village / locality | Chhikahra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00797 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Aug 2023 (this page) | Environmental approval granted | 5 acres | ₹74 lakh |
| Early planning filed 24 Jan 2023 | Cleared for impact study | 5 acres | ₹74 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is larger than 73% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 15 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Chhikahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 712,… — cleared for impact study, 0 m away
- "Building Stone (Khanda, Giiti, Boulder, Ballast) Mining Project" — environmental approval granted, 250 m away
- Building Stone As Granite Khanda, Boulder, Ballast (Giity) Mine — cleared for impact study, 250 m away
- Building Stone As Granite Khanda, Boulder, Ballast (Giity) Mine — environmental approval granted, 250 m away
- Proposed District Jail complex (990 capacity) at Mahoba, Uttar Pradesh — environmental approval granted, 4 km away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Mining… — cleared for impact study, 4.4 km away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Mining… — environmental approval granted, 4.4 km away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project — cleared for impact study, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.