Quick answers
What is this project?
Proposed District Jail complex (990 capacity) at Mahoba, Uttar Pradesh is an approved building project in Bilbai, Mahoba, Uttar Pradesh. The site covers 63.9 acres.
Who is building it?
The applicant is Sunil Chauhan.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Mar 2023), as of 27 Nov 2026.
Where is it?
In Bilbai, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹230.2 crore and a site of 63.9 acres.
When was it filed?
The application was filed on 18 Mar 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Mar 2023 |
| Application filed | 18 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sunil Chauhan |
| Land area | 63.9 acres (25.9 ha) |
| Project cost | ₹230.2 crore |
| Village / locality | Bilbai |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01375 |
In context
5 applications in Mahoba since January 2022 are in the same category (Buildings & townships): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bilbai, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rob at Km. 168+231 on NH-76 With Approaches in the State of Uttar Pradesh on… — more information requested, 3.6 km away
- "Building Stone (Khanda, Giiti, Boulder, Ballast) Mining Project" — environmental approval granted, 3.9 km away
- Building Stone As Granite Khanda, Boulder, Ballast (Giity) Mine — cleared for impact study, 3.9 km away
- Building Stone As Granite Khanda, Boulder, Ballast (Giity) Mine — environmental approval granted, 3.9 km away
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 712,… — environmental approval granted, 4 km away
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 712,… — cleared for impact study, 4 km away
- Four Laning of MP/UP Border near Kaimaha check post to Kabrai section of NH-34… — forest land use approved, 4.7 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Araji… — environmental approval granted, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.