Quick answers
What is this project?
Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichchaura Jhitkari (Khand No. 25/2, Area-18.370 Ha.) Tehsil- Sarila, District- Hamirpur, Uttar Pradesh Developed by M/s Digiana Industries (Prop. Shri Tejinder Pal Singh Ghumman) is a proposed mining project in Ichhaura, Sarila, Hamirpur, Uttar Pradesh. The site covers 45.4 acres.
Who is building it?
The applicant is Tejinder Pal Ghumman.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 15 Jun 2023), as of 27 Nov 2026.
Where is it?
In Ichhaura, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 45.4 acres.
When was it filed?
The application was filed on 15 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichchaura Jhitkari (Khand No.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 15 Jun 2023 |
| Application filed | 15 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Tejinder Pal Ghumman |
| Land area | 45.4 acres (18.4 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Ichhaura |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00826 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Nov 2024 | Environmental approval granted | 45.4 acres | ₹1.2 crore |
| Early planning filed 15 Jun 2023 (this page) | Cleared for impact study | 45.4 acres | ₹1.2 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 45.4 acres, this one is smaller than 57% of them.
No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.
Where it is
Ichhaura, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichchaura Jhitkari… — environmental approval granted, 0 m away
- Morrum Mining Project at Betwa River — environmental approval granted, 550 m away
- Morrum Mining Project at Betwa River — cleared for impact study, 550 m away
- Riverbed sand/morrum mining having lease area 31.120 ha along river Betwa in… — environmental approval granted, 1.2 km away
- Riverbed sand/morrum mining having lease area 31.120 ha along river Betwa in… — cleared for impact study, 1.2 km away
- Riverbed Sand Mine from Betwa River, Village- Ichora Jitkari, (Khand No. 25/9,… — environmental approval granted, 1.7 km away
- Riverbed Sand Mine from Betwa River, Village- Ichora Jitkari, (Khand No. 25/9,… — more information requested, 1.7 km away
- Proposed Project of riverbed "Morrum Mining Project" on the riverbed of River… — under environmental review, 2.2 km away
More from Tejinder Pal Ghumman in Hamirpur
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichora Jitkari, (Khand… — environmental approval granted
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichora Jitkari, (Khand… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.