Quick answers
What is this project?
Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichora Jitkari, (Khand No. 25/21, Area-17.731 Ha.) Tehsil- Sarila, District- Hamirpur, Uttar Pradesh Developed by M/s Digiana Industries (Prop. Shri Tejinder Pal Singh Ghumman) is a proposed mining project in Ichhaura, Sarila, Hamirpur, Uttar Pradesh. The site covers 43.8 acres.
Who is building it?
The applicant is Tejinder Pal Ghumman.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 May 2023), as of 27 Nov 2026.
Where is it?
In Ichhaura, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 43.8 acres.
When was it filed?
The application was filed on 16 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichora Jitkari, (Khand No.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 May 2023 |
| Application filed | 16 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Tejinder Pal Ghumman |
| Land area | 43.8 acres (17.7 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Ichhaura |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01108 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Dec 2023 | Environmental approval granted | 43.8 acres | ₹1.3 crore |
| Early planning filed 16 May 2023 (this page) | Cleared for impact study | 43.8 acres | ₹1.3 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 43.8 acres, this one is smaller than 60% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Ichhaura, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichora Jitkari, (Khand… — environmental approval granted, 0 m away
- Morrum Mining Project — environmental approval granted, 500 m away
- Morrum Mining Project — cleared for impact study, 500 m away
- Sand/ Morrum Mining Project at Betwa River Khand No. – 25/20 Village:… — cleared for impact study, 700 m away
- Sand/ Morrum Mining Project at Betwa River Khand No. – 25/20 Village:… — environmental approval granted, 700 m away
- MORRUM MININIG PROJECT — cleared for impact study, 1.3 km away
- Environment clearance proposed riverbed sand/morrum mining having lease area… — environmental approval granted, 1.3 km away
- Environment clearance proposed riverbed sand/morrum mining having lease area… — cleared for impact study, 1.3 km away
More from Tejinder Pal Ghumman in Hamirpur
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichchaura Jhitkari… — environmental approval granted
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichchaura Jhitkari… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.